The City will
run city sewer to areas that are annexed into the city
limits. For the City to actually extend sewer by individual
houses in order for residents to tie on, a petition
process must be followed. Please contact the Engineering
Department at (919) 775-8010 for a petition circulate.
The petition requires the signature of at least 51
percent of the lot owners owning at least 51% of the
property in the area affected.
Once the petition is signed, an estimate is prepared
on the total cost, and the property owners are advised
of their estimated share of this cost. At that point,
the property owners can decide if they want to go forward
with the extension.
Payments for the assessment can be financed for a maximum
of nine years at 8% interest. The assessment cost will
begin after construction is completed. The assessment
is for the main line only. It does not include the tap
or the house connection. The property owner may elect
to have the tap fee financed along with their assessment.
Property owners have the option of connecting to the
line at any time they decide. If the property owner
decides to have their connection to the line installed
as part of the construction project, their fee for doing
so shall be one-half of the prevailing rate.
If a tap is made during construction, the billing for
sewer service will begin at the time you connect to
the tap or one month following confirmation of the assessment
roll, whichever is earlier.
If the community
would like to have a representative of the City meet
with them as a group to provide further information
and answer any questions, please call the Engineering
Division at (919) 775-8010.
|